Deploy using Microsoft Hyper-V
The following steps will walk you through the deployment:
Info
The PAM Server must be deployed on a Generation 2 virtual machine.
- 
Within your existing Hyper-V infrastructure, create a new virtual machine with a custom configuration. 
- 
On the Before You Begin screen click Next >. 
- 
On the Specify Name and Location screen, enter the name and location based on your preferences and click Next >. 
- 
On the Specify Generation screen, select Generation 1 and click Next >. Warning Do not select Generation 2 as it is not supported. Note When adding an external disk it must to be mounted to the IDE controller for it to work. For further information see File store. 
- 
On the Assign Memory screen, set the Startup memory as 16384 MB, deselect the Use Dynamic Memory for this virtual machine and click Next >. 
- 
On the Configure Networking screen, set the Connection based on your preferences and click Next >. 
- 
On the Connect Virtual Hard Disk screen, select Use an existing virtual hard disk, browse to the download VHD file and click Next >. 
- 
On the Summary screen verify the details shown and click Finish. 
- 
Wait while the virtual appliance is created. 
- 
In the Virtual Machines list, right-click the new virtual appliance and click Settings.... 
- 
In Processor, assign 8 virtual processors to the virtual appliance.  
- 
In the Virtual Machines list, right-click the virtual appliance and select Start.
- 
Once started, right-click the virtual appliance and select Connect. The virtual machine will open in a window on your desktop.
- 
Once the servers have been successfully deployed and powered on the next step is to configure the servers.